Harmonization of Apprenticeship Training

Provincial and territorial apprenticeship authorities are each responsible for their respective apprenticeship programs. In the spirit of continual improvement, and to facilitate mobility among apprentices in Canada, participating authorities have agreed to work towards harmonizing certain aspects of their programs where possible. After consulting with their stakeholders in the trade, they have reached consensus on the following elements. Note that implementation of these elements may vary from jurisdiction to jurisdiction, depending on their own circumstances. For more information on the implementation in any province and territory, please contact that jurisdiction’s apprenticeship authority.

1. Trade name

The official Red Seal name for this trade is Tilesetter.

2. Number of Levels of Apprenticeship

The number of levels of technical training recommended for this trade is three (3).

3. Total Training Hours

The total hours of training, including both on-the-job and in-school training for this trade is 5400.

4. Sequencing Topics and Related Sub-tasks

The topic titles in the table below are placed in a column for each apprenticeship level for technical training. Each topic is accompanied by the sub-tasks and their reference number. The topics in the grey shaded cells represent those that are covered “in context” with other training in the subsequent years.

Sequencing Topics and Related Sub-tasks
Level 1 Level 2 Level 3
  Safety-Related Functions in context Safety-Related Functions in context
  Tools and Equipment in context Tools and Equipment in context
  Organizes Work in context Organizes Work in context
    Surfaces (Evaluate and Prepare) in context
  Existing Finishes (Removes) in context Existing Finishes (Removes) in context
Safety-Related Functions
  • 1.01 Maintains safe work environment
  • 1.02 Uses personal protective equipment (PPE) and safety equipment
   
Tools and Equipment
  • 2.01 Uses tools and equipment
  • 2.02 Uses access equipment
  • 2.03 Uses rigging, hoisting and lifting equipment
   
Organizes Work
  • 3.01 Estimates materials, supplies and labour
  • 3.02 Organizes materials, supplies and work site
  • 3.03 Evaluates damages and deficiencies
  • 3.04 Uses communication techniques
   
Communication
  • 3.04 Uses communication techniques
  Mentoring
  • 3.05 Uses mentoring techniques
Existing Finishes (Removes)
  • 4.01 Removes surface coverings
  • 4.02 Cleans surfaces
   
Surfaces (Evaluate and Prepare)-Introduction
  • 5.01 Assesses existing substrate
  • 5.02 Installs membranes
  • 5.03 Installs mortar beds
  • 5.04 Installs underlayments
Surfaces (Evaluate and Prepare)
  • 5.01 Assesses existing substrate
  • 5.02 Installs membranes
  • 5.03 Installs mortar beds
  • 5.04 Installs underlayments
 
  Specialty Products
  • 6.01 Installs sound barrier products
  • 6.02 Installs in-floor heating
  • 6.03 Installs engineered products
Specialty Products
  • 6.01 Installs sound barrier products
  • 6.02 Installs in-floor heating
  • 6.03 Installs engineered products
Work Area (Lay Out)
  • 7.01 Confirms site measurements
  • 7.02 Determines tile layout for best visual effect
  • 7.03 Lays out grid lines
  • 7.04 Evaluates rise and run of stairs
Work Area (Lay Out)
  • 7.01 Confirms site measurements
  • 7.02 Determines tile layout for best visual effect
  • 7.03 Lays out grid lines
  • 7.04 Evaluates rise and run of stairs
Work Area (Lay Out)
  • 7.01 Confirms site measurements
  • 7.02 Determines tile layout for best visual effect
  • 7.03 Lays out grid lines
  • 7.04 Evaluates rise and run of stairs
Joints - Introduction
  • 8.01 Accommodates existing joints
  • 8.02 Determines additional joint requirements
Joints
  • 8.01 Accommodates existing joints
  • 8.02 Determines additional joint requirements
 
Material Inspection
  • 9.01 Confirms material consistencies
  • 9.02 Checks materials for damage
Material Inspection
  • 9.01 Confirms material consistencies
  • 9.02 Checks materials for damage
Material Inspection
  • 9.01 Confirms material consistencies
  • 9.02 Checks materials for damage
Material Preparation for Installation
  • 10.01 Prepares tiles
  • 10.02 Prepares stone slabs
Material Preparation for Installation
  • 10.01 Prepares tiles
  • 10.02 Prepares stone slabs
 
Materials (Mixes)
  • 11.01 Mixes materials for tile and stone
  • 11.02 Mixes materials for mortar beds
  • 11.03 Mixes materials for terrazzo
Materials (Mixes)
  • 11.01 Mixes materials for tile and stone
  • 11.02 Mixes materials for mortar beds
  • 11.03 Mixes materials for terrazzo
 
Tile Installation
  • 12.01 Applies setting materials
  • 12.02 Sets tiles
  • 12.03 Installs accessories
Tile Installation
  • 12.01 Applies setting materials
  • 12.02 Sets tiles
  • 12.03 Installs accessories
  • 12.04 Installs expansion and control joints
  • 12.05 Installs tile trim
Tile Installation
  • 12.02 Sets tiles
  • 12.03 Installs accessories
  • 12.04 Installs expansion and control joints
  • 12.05 Installs tile trim
Stone Slabs - Introduction
  • 13.01 Installs anchors
  • 13.02 Applies stone slab setting material
Stone Slabs
  • 13.01 Installs anchors
  • 13.02 Applies stone slab setting material
  • 13.03 Mounts stone slabs
  • 13.04 Works surface
 
Terrazzo Mixture - Introduction
  • 14.01 Installs divider strips for terrazzo
  • 14.02 Applies bond coat
  • 14.03 Trowels in terrazzo mixture
  • 14.04 Works surface
Terrazzo Mixture
  • 14.01 Installs divider strips for terrazzo
  • 14.02 Applies bond coat
  • 14.03 Trowels in terrazzo mixture
  • 14.04 Works surface
 
Installed Product (Finishes)
  • 15.01 Installs grout
  • 15.02 Caulks joints
  • 15.03 Seals material
Installed Product (Finishes)
  • 15.01 Installs grout
  • 15.02 Caulks joints
  • 15.03 Seals material
 
Terrazzo and Stone (Finishes) - Introduction
  • 16.01 Grinds terrazzo and stone
  • 16.02 Grouts terrazzo and stone
  • 16.03 Seals terrazzo and stone
Terrazzo and Stone (Finishes)
  • 16.01 Grinds terrazzo and stone
  • 16.02 Grouts terrazzo and stone
  • 16.03 Seals terrazzo and stone