Examination Weightings
Pie Chart of Red Seal Examination Weightings
Plumber Task Matrix and Weightings
Major Work Activity A - Performs common occupational skills 11%
- Task A-1 Performs safety-related functions 19%
- A-1.01 Maintains safe work environment
- A-1.02 Uses personal protective equipment (PPE) and safety equipment
- A-1.03 Performs lock-out and tag-out (LOTO) procedures
- Task A-2 Uses and maintains tools and equipment 23%
- A-2.01 Uses common tools and equipment
- A-2.02 Uses access equipment
- A-2.03 Uses rigging, hoisting, lifting and positioning equipment
- A-2.04 Rigs loads for cranes
- A-2.05 Uses welding equipment
- A-2.06 Uses soldering and brazing equipment
- Task A-3 Organizes work 20%
- A-3.01 Organizes project tasks and procedures
- A-3.02 Organizes materials and supplies
- A-3.03 Uses documentation
- Task A-4 Performs routine trade activities 34%
- A-4.01 Plans layout for piping systems
- A-4.02 Calculates tube, tubing and pipe lengths
- A-4.03 Installs piping supports
- A-4.04 Installs piping sleeves
- A-4.05 Commissions systems
- A-4.06 Protects piping systems, equipment and structure from damage
- A-4.07 Coordinates excavation and backfilling of trenches
- A-4.08 Installs fire stopping devices and materials
- Task A-5 Uses communication and mentoring techniques 4%
- A-5.01 Uses communication techniques
- A-5.02 Uses mentoring techniques
Major Work Activity B - Prepares and assembles tube, tubing and pipe 10%
- Task B-6 Prepares tube, tubing and pipe 46%
- B-6.01 Inspects tube, tubing, pipe and fittings before installation
- B-6.02 Cuts tube, tubing and pipe
- B-6.03 Bends tube, tubing and pipe
- B-6.04 Prepares tube, tubing and pipe connections
- Task B-7 Joins tube, tubing and pipe 54%
- B-7.01 Joins copper tube, tubing and pipe
- B-7.02 Joins plastic tube, tubing and pipe
- B-7.03 Joins steel tube, tubing and pipe
- B-7.04 Joins cast iron pipe
- B-7.05 Joins specialized tube, tubing and pipe
Major Work Activity C - Installs, tests and services sewers, sewage treatment systems and drainage, waste and vent (DWV) systems 26%
- Task C-8 Installs, tests and services sewers 20%
- C-8.01 Plans layout and sizes piping for sewers
- C-8.02 Installs maintenance holes and catch basins
- C-8.03 Installs piping for sewers
- C-8.04 Tests maintenance holes, catch basins and piping for sewers
- C-8.05 Services maintenance holes, catch basins and piping for sewers
- Task C-9 Installs, tests and services sewage treatment systems 17%
- C-9.01 Plans installation of sewage treatment systems
- C-9.02 Installs components for sewage treatment systems
- C-9.03 Tests sewage treatment systems
- C-9.04 Services sewage treatment systems
- Task C-10 Installs, tests and services interior drainage, waste and vent (DWV) systems 63%
- C-10.01 Plans layout and sizes piping for interior drainage, waste and vent (DWV) systems
- C-10.02 Installs underground piping and components for interior drainage, waste and vent (DWV) systems
- C-10.03 Installs above-ground piping and components for interior drainage, waste and vent (DWV) systems
- C-10.04 Tests interior drainage, waste and vent (DWV) systems
- C-10.05 Services interior drainage, waste and vent (DWV) systems
Major Work Activity D - Installs, tests and services water service and distribution 19%
- Task D-11 Installs, tests and services water service 24%
- D-11.01 Plans layout and sizes piping and components for water service
- D-11.02 Installs piping for water service
- D-11.03 Installs components for water service
- D-11.04 Tests water service piping and components
- D-11.05 Services water service piping and components
- Task D-12 Installs, tests and services potable water distribution systems 49%
- D-12.01 Plans layout and sizes piping and components for potable water distribution systems
- D-12.02 Installs piping for potable water distribution systems
- D-12.03 Installs components for potable water distribution systems
- D-12.04 Installs cross connection controls
- D-12.05 Tests potable water distribution systems
- D-12.06 Services potable water distribution systems
- Task D-13 Installs, tests and services private water pressure systems 27%
- D-13.01 Plans layout and sizes piping and components for private water pressure systems
- D-13.02 Installs piping for private water pressure systems
- D-13.03 Installs components for private water pressure systems
- D-13.04 Tests private water pressure systems
- D-13.05 Services private water pressure systems
Major Work Activity E - Installs, tests and services fixtures, appliances and water treatment systems 13%
- Task E-14 Installs, tests and services plumbing fixtures and appliances 63%
- E-14.01 Installs fixture supports
- E-14.02 Installs plumbing fixtures and appliances
- E-14.03 Tests plumbing fixtures and appliances
- E-14.04 Services plumbing fixtures and appliances
- Task E-15 Installs, tests and services water treatment systems 37%
- E-15.01 Sizes water treatment systems
- E-15.02 Installs water treatment systems
- E-15.03 Tests water treatment systems
- E-15.04 Services water treatment systems
Major Work Activity F - Installs, tests and services low-pressure steam and hydronic systems 13%
- Task F-16 Installs, tests and services low-pressure steam systems - Not Common Core 0%
- F-16.01 Plans layout and sizes piping and components for low-pressure steam systems- Not Common Core
- F-16.02 Installs piping and components for low-pressure steam systems- Not Common Core
- F-16.03 Tests low-pressure steam systems- Not Common Core
- F-16.04 Services low-pressure steam systems- Not Common Core
- Task F-17 Installs, tests and services piping and components for hydronic systems 58%
- F-17.01 Plans layout and sizes piping and components for hydronic systems
- F-17.02 Installs piping and components for hydronic systems
- F-17.03 Tests hydronic systems
- F-17.04 Services hydronic systems
- Task F-18 Installs, tests and services hydronic heating and cooling equipment 42%
- F-18.01 Installs hydronic heating equipment
- F-18.02 Installs hydronic cooling equipment
- F-18.03 Tests hydronic heating and cooling equipment
- F-18.04 Services hydronic heating and cooling equipment
Major Work Activity G - Installs, tests and services specialized systems 8%
- Task G-19 Installs, tests and services process piping systems 51%
- G-19.01 Plans layout and sizes piping and components for process piping systems
- G-19.02 Installs piping for process piping systems
- G-19.03 Installs components for process piping systems
- G-19.04 Tests process piping systems
- G-19.05 Services process piping systems
- Task G-20 Installs, tests and services potable water fire protection systems - Not Common Core 0%
- G-20.01 Plans layout and sizes piping for potable water fire protection systems - Not Common Core
- G-20.02 Installs potable water fire protection systems - Not Common Core
- G-20.03 Tests potable water fire protection systems - Not Common Core
- G-20.04 Services potable water fire protection systems – Not Common Core
- Task G-21 Installs, tests and services other specialized systems 49%
- G-21.01 Plans layout and sizes piping, components and equipment for other specialized systems
- G-21.02 Installs piping and components for other specialized systems
- G-21.03 Installs equipment for other specialized systems
- G-21.04 Tests other specialized systems
- G-21.05 Services other specialized systems