Table of Contents
Task C-8 Performs pre-construction activities
Task Descriptor
Landscape horticulturists identify plants and requirements to manage health, growing conditions, pests, diseases and invasive species. They apply horticultural principles to sustain and promote plant life and the growing environment.
C-8.01 - Participates in landscape design activities
Essential Skills: Document Use, Thinking, Oral Communication
C-8.01 - Participates in landscape design activities
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
no |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-8.01.01P |
select and use tools |
tools are selected according to industry practices and manufacturers' specifications |
C-8.01.02P |
measure and inventory existing site conditions |
information for the design is provided according to measurements and inventory of existing site plan and site analysis |
C-8.01.03P |
apply design principles |
design principles are applied according to industry practices |
C-8.01.04P |
create landscape drawings |
landscape drawings are created according to client consultation, jurisdictional regulations and standards |
Range of Variables
- tools include: levels, GPS, measuring devices
- design principles include: texture, colour, form, scale, balance, rhythm, unity
- standards include: American National Standards Institute (ANSI), CLS, OH&S
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-8.01.01L |
demonstrate knowledge of landscape drawings and associated documentation |
identify types of landscape drawings and associated documentation and describe their characteristics and applications |
interpret landscape drawings |
interpret information on specifications |
C-8.01.02L |
demonstrate knowledge of the procedures used to perform site measurements |
define terminology associated with site measurements |
identify hazards and describe safe work practices pertaining to site measurements |
interpret documentation pertaining to site measurements |
identify the methods and procedures used to stake out points when performing site measurements |
C-8.01.03L |
demonstrate knowledge of landscape design |
describe the applications of design principles in landscape drawings |
Range of Variables
- landscape drawings include: drainage, elevation, grading, lighting, irrigation, planting
- documentation includes: specifications, codes, standards
- site measurements include: grade levels and stake interpretation, grid system, triangulation
- design principles include: texture, colour, form, scale, balance, rhythm, unity
C-8.02 - Prepares construction site
Essential Skills: Document Use, Thinking, Oral Communication
C-8.02 - Prepares construction site
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-8.02.01P |
select and use hand and measuring tools |
hand and measuring tools are selected and used according to task requirements and manufacturers' specifications |
C-8.02.02P |
select and use motorized equipment |
motorized equipment is selected and used according to task requirements, site access and manufacturers' specifications |
C-8.02.03P |
identify and communicate discrepancies between plans and site conditions |
plan and site conditions are identified and discrepancies are communicated to employer and stakeholders |
C-8.02.04P |
preserve and protect existing hardscape and softscape elements and soil |
existing hardscape and softscape elements and soil are preserved and protected according to drawings, specifications, CLS and jurisdictional regulations |
C-8.02.05P |
remove hazards, debris and other unwanted materials |
hazards, debris and other unwanted materials are removed according to drawings and specifications |
C-8.02.06P |
create site access |
site access is created according to drawings, specifications and site conditions |
C-8.02.07P |
identify markings of underground and overhead utility hazards |
underground and overhead utility hazard markings are identified according to locate information |
C-8.02.08P |
interpret and extract locate information for privately-owned and public utilities |
locate information for privately-owned and public utilities is interpreted and extracted |
C-8.02.09P |
locate and cordon off areas |
areas are located and cordoned off using barriers to minimize access and environmental impact |
C-8.02.10P |
install environmental mitigation mechanisms |
environmental mitigation mechanisms are installed according to manufacturers' specifications, drawings, specifications, jurisdictional regulations and CLS |
C-8.02.11P |
lay out site by marking and staking location of hardscape and softscape elements to be installed |
location of hardscape and softscape elements to be installed is marked and staked out according to drawings and specifications |
C-8.02.12P |
excavate and place service conduits |
service conduits are excavated and placed to support activities according to drawings and specifications, jurisdictional regulations and CLS |
C-8.02.13P |
verify site preparation |
site preparation meets drawings and specifications |
Range of Variables
- hand and measuring tools include: shovels, builders’ levels, transits
- motorized equipment includes: loaders, skid-steers, excavators
- stakeholders include: property owners, designers, engineers
- existing hardscape and softscape elements include: trees, decks
- privately-owned and public utilities include: fibre-optics, gas lines, septic, hydro, water, sewer
- environmental mitigation mechanisms include: filters, silt fencing, storm sewer guards
- activities include: installing irrigation systems and low voltage wiring
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-8.02.01L |
demonstrate knowledge of the procedures used to prepare construction site |
identify the considerations and requirements when preparing construction sites |
describe the procedures used to prepare construction sites |
C-8.02.02L |
demonstrate knowledge of landscape drawings and associated documentation |
interpret and extract information from landscape drawings and documentation related to construction site preparation |
C-8.02.03L |
demonstrate knowledge of the procedures used to perform site layout |
identify the methods and procedures used to stake out points when performing site layout as it pertains to construction site preparation |
Range of Variables
- information includes: general conditions, supplementary conditions, contract personnel
- methods and procedures include: grade levels and stake interpretation, grid system, triangulation
C-8.03 - Performs grading
Essential Skills: Document Use, Thinking, Numeracy
C-8.03 - Performs grading
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-8.03.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-8.03.02P |
strip and stockpile topsoil |
topsoil is stripped and stockpiled according to drawings, specifications, jurisdictional regulations and CLS |
C-8.03.03P |
cut and fill material to establish rough grade |
material is cut and filled to establish rough grade according to drawings, specifications and industry standards |
C-8.03.04P |
prepare site for positive drainage |
site is prepared for positive drainage according to drawings, specifications, jurisdictional regulations and CLS |
C-8.03.05P |
verify that site is prepared |
site preparation meets drawings and specifications |
Range of Variables
- tools and equipment include: shovels, rakes, excavators, loaders, skid-steers, tractors, attachments
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-8.03.01L |
demonstrate knowledge of the procedures used to perform grading |
define terminology associated with grading |
identify hazards and describe safe work practices pertaining to grading |
describe the implications of grading on the practice of environmental stewardship |
interpret codes and regulations pertaining to grading |
interpret documentation pertaining to drainage plans |
identify specific tools and equipment relating to grading and describe their applications and procedures for use |
identify types of grading plans |
describe the procedures used to perform site grading |
Range of Variables
- tools and equipment include: shovels, rakes, excavators, loaders, skid-steers, tractors, attachments
- grading plans include: existing grades, proposed grades (finished), contour plans
- site grading includes: rough grading, grading for drainage, finish grading
C-8.04 - Installs drainage systems
Essential Skills: Document Use, Thinking, Numeracy
C-8.04 - Installs drainage systems
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-8.04.01P |
identify drainage system requirements |
drainage system requirements are identified according to drawings, specifications and jurisdictional regulations |
C-8.04.02P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-8.04.03P |
calculate elevation and slope |
elevation and slope are calculated to verify drainage according to drawings and specifications |
C-8.04.04P |
excavate subsoil to grade and depth |
subsoil is excavated according to specifications and CLS |
C-8.04.05P |
store or remove excavated materials |
excavated materials are stored or removed according to industry practices and jurisdictional regulations |
C-8.04.06P |
lay out, assemble and place drainage components |
drainage components are laid out, assembled and placed according to drawings and specifications |
C-8.04.07P |
backfill drainage system to finished grade |
drainage system is backfilled to finished grade according to specifications |
C-8.04.08P |
verify installation |
installation meets drawings and specifications |
Range of Variables
- drainage systems include: sub-surface drain, surface drainage
- tools and equipment include: shovels, picks, wheelbarrows, excavators, trenchers, loaders, skid-steers, builder’s levels, transits
- drainage components include: drainage pipes, aggregates, drains, catch basins
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-8.04.01L |
demonstrate knowledge of the procedures used to perform grading and installation of drainage systems |
identify types of drainage systems |
interpret documentation pertaining to site protection, grading and drainage |
interpret codes and regulations pertaining to site protection, grading and drainage |
identify hazards and describe safe work practices pertaining to site layout, grading and drainage |
describe the implications of site protection, grading and drainage on the practice of environmental stewardship |
identify types of grading |
identify calculations required to determine slope |
describe the procedures used to perform site grading |
describe the procedures used to install drainage systems |
Range of Variables
- drainage systems include: sub-surface drain, surface drainage
- documentation includes: grading plans (existing grades, proposed grades, rough grades, finished grades), drainage plans, specifications
- grading includes: rough grading, grading for drainage, finish grading
Task C-9 Installs hardscape
Task Descriptor
Landscape horticulturists install hardscape features such as fences, decks, pergolas, gazebos, walkways, patios, driveways, retaining walls, and water features. Enhancements such as lighting and irrigation are also key hardscape features. These features all comply with drawings, specifications, regulations and codes to ensure the integrity of the installation.
C-9.01 Installs landscape structures
Essential Skills: Numeracy, Document Use, Working with Others
C-9.01 Installs landscape structures
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-9.01.01P |
select and use hand and power tools |
hand and power tools are selected and used according to task requirements and manufacturers' specifications |
C-9.01.02P |
select and use equipment |
equipment is selected and used according to task requirements and manufacturers' specifications |
C-9.01.03P |
lay out and mark construction area |
construction area is laid out and marked according to drawings, specifications and permits |
C-9.01.04P |
excavate construction area |
construction area is excavated according to drawings and specifications |
C-9.01.05P |
prepare foundation |
foundation is prepared according to drawings and specifications, building code and manufacturers' specifications |
C-9.01.06P |
construct landscape structures |
landscape structures are constructed according to drawings, specifications, manufacturers' specifications, building codes and jurisdictional regulations |
C-9.01.07P |
verify installation |
installation meets drawings and specifications |
C-9.01.08P |
clean structures |
structures are cleaned according to industry standards |
C-9.01.09P |
repair construction access |
access area is restored to original state |
C-9.01.10P |
dispose of, or recycle, excess materials |
excess materials are disposed of, or recycled, according to jurisdictional regulations |
C-9.01.11P |
apply preservatives, stains and sealants |
preservatives, stains and sealants are applied to provide ease of cleaning, longevity and aesthetics according to product specifications and jurisdictional regulations |
Range of Variables
- hand and power tools include: hammers, mitre saws, power drills
- equipment includes: excavators, loaders, skid-steers, attachments
- landscape structures include: decks, pergolas, outdoor kitchens, gazebos, fences
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-9.01.01L |
demonstrate knowledge of landscape structures and their application |
define terminology associated with various landscape structures |
identify hazards and describe safe work practices pertaining to installing landscape structures |
interpret codes and regulations pertaining to various landscape structures |
C-9.01.02L |
demonstrate knowledge of the procedures, products and materials used to construct landscape structures |
identify products and materials used in landscape structure construction and describe their applications and procedures for use |
describe the preparation procedures used to install landscape structures |
describe the procedures used to estimate quantities of materials required to construct landscape structures |
C-9.01.03L |
demonstrate knowledge of the procedures used to perform site layout |
interpret documentation pertaining to site layout |
identify the methods and procedures used to perform site layout |
C-9.01.04L |
demonstrate knowledge of the procedures used to install poured concrete foundation |
describe the preparation and installation procedures used to install poured concrete foundation |
Range of Variables
- landscape structures include: decks, pergolas, outdoor kitchens, gazebos, fences
- methods and procedures include: grade levels and stake interpretation, grid system, triangulation
C-9.02 Installs surface materials
Essential Skills: Document Use, Working with Others, Numeracy
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-9.02.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements, manufacturers' specifications and CLS |
C-9.02.02P |
lay out and mark construction area |
construction area is laid out and marked according to drawings and specifications |
C-9.02.03P |
excavate area and compact sub-grade |
area is excavated and sub-grade is compacted according to specifications and CLS |
C-9.02.04P |
store or remove excavated materials |
excavated materials are stored or removed according to industry practices and jurisdictional regulations |
C-9.02.05P |
place geotextiles |
geotextiles are placed for base stability according to drawings and specifications |
C-9.02.06P |
add aggregate base and compact in lifts |
aggregate base is added and lifts are compacted according to drawings and specifications and jurisdictional regulations |
C-9.02.07P |
create or maintain adequate grade |
adequate grade is created or maintained to ensure positive drainage according to drawings and specifications |
C-9.02.08P |
secure edge restraints for finished material |
edge restraints for finished material are secured according to industry standards, drawings and specifications |
C-9.02.09P |
select surface materials |
surface materials are selected according to intended use, drawings and specifications |
C-9.02.10P |
place bedding materials |
bedding materials are placed according to drawings and specifications and industry standards |
C-9.02.11P |
screed bedding materials |
bedding materials are screeded according to industry standards |
C-9.02.12P |
install surface materials |
surface materials are installed according to industry standards and manufacturers' specifications |
C-9.02.13P |
measure, cut and fit surface materials |
surface materials are measured, cut and fit according to drawings, specifications and task requirements |
C-9.02.14P |
clean surfaces |
surfaces are cleaned according to industry standards |
C-9.02.15P |
apply joint materials |
joint materials are applied according to product specifications |
C-9.02.16P |
compact surfaces |
surfaces are compacted according to manufacturers' specifications and industry standards |
C-9.02.17P |
clean and seal surface materials |
surface materials are cleaned and sealed according to manufacturers’ specifications |
C-9.02.18P |
verify installation |
installation meets specifications |
C-9.02.19P |
clean and repair construction access |
construction access is cleaned and repaired according to task requirements |
C-9.02.20P |
dispose of, or recycle, excess materials |
excess materials are disposed of, or recycled, according to jurisdictional regulations |
Range of Variables
- tools and equipment include: shovels, picks, chisels, wheelbarrows, brooms, power blowers, excavators, plate compactors, concrete saws
- surface materials include: natural stones, concrete, paving stones (segmental pavement), aggregate, permeable pavement, synthetic materials (artificial turf)
- bedding materials include: sand, aggregates, high performance bedding materials, concrete bases
- joint materials include: mortars, sand, polymeric sand
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-9.02.01L |
demonstrate knowledge of the procedures used to install surface materials |
define terminology associated with hardscape installation and maintenance |
identify types of surface materials, their applications and use |
identify bedding materials and base used with various surface materials |
identify hazards and describe safe work practices pertaining to hardscape installation |
interpret codes, regulations and manufacturers’ specifications pertaining to hardscape installation |
interpret documentation pertaining to hardscape installation |
identify specific tools and equipment relating to hardscape installation and describe their applications and procedures for use |
describe the procedures used to prepare for installation of surface materials |
describe the procedures used to install surface materials |
describe the procedures used to estimate quantities of materials required to install surface materials |
Range of Variables
- surface materials include: natural stones, concrete, paving stones (segmental pavement), aggregate, permeable pavement, synthetic materials (artificial turf)
- bedding materials include: sand, aggregates, high performance bedding materials, concrete bases
- documentation includes: drawings, contract specifications, shipping documents, manufacturers' specifications
- tools and equipment include: shovels, picks, chisels, wheelbarrows, brooms, power blowers, excavators, plate compactors, concrete saws
C-9.03 - Installs steps and retaining walls
Essential Skills: Document Use, Working with Others, Numeracy
C-9.03 - Installs steps and retaining walls
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
no |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-9.03.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements, manufacturers' specifications and CLS |
C-9.03.02P |
lay out and mark construction area |
construction area is laid out and marked according to drawings and specifications |
C-9.03.03P |
excavate area and compact sub-grade |
area is excavated and sub-grade is compacted according to specifications and CLS |
C-9.03.04P |
store or remove excavated materials |
excavated materials are stored or removed according to industry practices and jurisdictional regulations |
C-9.03.05P |
place geotextile materials |
geotextiles are placed for base stability according to drawings and specifications |
C-9.03.06P |
install aggregate base and compact in lifts |
aggregate base is installed and lifts are compacted according to industry standards and manufacturers' specifications |
C-9.03.07P |
install concrete foundation for mortared natural stone wall |
concrete foundation for mortared natural stone wall is installed according to drawings and specifications |
C-9.03.08P |
place bedding materials |
bedding materials are placed according to drawings, specifications and industry standards |
C-9.03.09P |
screed bedding materials |
bedding materials are screeded according to industry standards |
C-9.03.10P |
build walls and steps |
walls and steps are built following procedures and using materials according to drawings, specifications, jurisdictional regulations, manufacturers' specifications and industry standards |
C-9.03.11P |
place drainage systems and backfill |
drainage systems are placed and backfilled according to drawings, specifications and manufacturers' specifications |
C-9.03.12P |
install adhesives or mortars |
adhesives or mortars are installed to secure capstones and treads according to manufacturers' specifications |
C-9.03.13P |
clean surfaces |
surfaces are cleaned according to industry standards |
C-9.03.14P |
seal steps and retaining walls |
steps and retaining walls are sealed according to product specifications |
C-9.03.15P |
verify installation |
installation meets specifications |
C-9.03.16P |
clean and repair construction access |
construction access is cleaned and repaired according to task requirements |
C-9.03.17P |
dispose of, or recycle, excess materials |
excess materials are disposed of, or recycled, according to jurisdictional regulations |
Range of Variables
- tools and equipment include: shovels, picks, stone chisels, wheelbarrows, brooms, power washers, excavators, plate compactors, concrete saws, concrete mixers
- bedding materials include: sand, limestone screening, concrete footing
- procedures include: stacking and assembling courses, installing geogrid, staggering seams and batter
- materials include: timber, natural stone, manufactured stones
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-9.03.01L |
demonstrate knowledge of the procedures used to install wall units and steps |
define terminology associated with hardscape installation |
identify hazards and describe safe work practices pertaining to hardscape installation |
interpret codes, regulations and manufacturers’ specifications pertaining to hardscape installation |
identify types of materials used in wall and step construction and describe their characteristics and applications |
describe the procedures used to prepare for installation of walls and steps |
describe the procedures used to install walls and steps |
describe the procedures used to estimate quantities of materials required to install wall units and steps |
Range of Variables
- materials include: timber, natural stone, manufactured stones
C-9.04 Installs irrigation systems
Essential Skills: Document Use, Numeracy, Digital Technology
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-9.04.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements, manufacturers' specifications |
C-9.04.02P |
mark proposed irrigation plan |
proposed irrigation plan is marked according to drawings and specifications |
C-9.04.03P |
excavate or trench area and install pipe |
area is excavated or trenched to grade and depth, and pipe is installed according to drawings and specifications, and CLS |
C-9.04.04P |
store or remove excavated materials |
excavated materials are stored or removed according to industry standards and jurisdictional regulations |
C-9.04.05P |
lay out and assemble irrigation components |
irrigation components are laid out and assembled according to manufacturers’ specifications, irrigation plan and jurisdictional regulations |
C-9.04.06P |
backfill trenches with materials to finished grade |
trenches are backfilled with materials to finished grade according to drawings and specifications |
C-9.04.07P |
set head heights and nozzles of irrigation system |
head heights and nozzles of irrigation system are set to ensure coverage |
C-9.04.08P |
install and program control system |
control system is installed and programmed according to landscape and environmental requirements |
C-9.04.09P |
verify installation and operation |
installation meets specifications and site conditions |
C-9.04.10P |
clean and restore area |
area is restored and cleaned to original state |
C-9.04.11P |
dispose of, or recycle, excess materials |
excess materials are disposed of, or recycled, according to jurisdictional regulations |
Range of Variables
- tools and equipment include: pipe cutters, crimping tools, trenching shovels, pipe puller, wheelbarrows, excavators, trenchers, loaders, skid steers, attachments
- environmental requirements include: soil type, evapo-transpiration rates, plant needs
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-9.04.01L |
demonstrate knowledge of irrigation equipment and systems, their applications and operation |
define terminology associated with irrigation |
identify hazards and describe safe work practices pertaining to irrigation |
describe the implications of irrigation on the practice of environmental stewardship |
identify tools and equipment related to irrigation and describe their applications and procedures for use |
identify the factors that determine irrigation rates and methods |
identify water sources for irrigation and describe the considerations and procedures for determining water quality and availability |
identify the types of irrigation systems |
identify system components and describe their applications and procedures for use |
C-9.04.02L |
demonstrate knowledge of the procedures used to install irrigation equipment and systems |
describe the procedures used to install irrigation equipment and systems |
Range of Variables
- tools and equipment include: pipe cutters, crimping tools, trenching shovels, pipe puller, wheelbarrows, excavators, trenchers, loaders, skid steers, attachments
- factors include: plant material (growth stage, mature size, water use rate), root zone assessment, soil/water relationship, site conditions, application (time, rate, duration), climate
- considerations and procedures for determining water quality and availability include: sample preparation, water testing, water pressure, flow rate, results interpretation
- irrigation systems include: drip/low water volume, sprinkler
- system components include: screens, heads, pipes, wires, filters, valves
C-9.05 - Installs water features
Essential Skills: Working with Others, Thinking, Numeracy
C-9.05 - Installs water features
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-9.05.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements, manufacturers' specifications |
C-9.05.02P |
lay out and mark construction area |
construction area is laid out and marked according to drawings and specifications |
C-9.05.03P |
excavate and store or remove excavated materials |
materials are excavated and stored or removed according to site requirements, industry standards and jurisdictional regulations |
C-9.05.04P |
place sand and geotextile materials |
sand and geotextile materials are placed according to design and manufacturers' specifications |
C-9.05.05P |
install liners and aggregates |
liners and aggregates are installed according to design |
C-9.05.06P |
complete assembly of water supply components and filtration systems |
water supply components and filtration systems are assembled according to manufacturers' specifications |
C-9.05.07P |
apply adhesives, foams and mortar |
adhesives, foams and mortar are applied to secure and seal assembly according to manufacturers' specifications |
C-9.05.08P |
add water, operate water systems and check for leaks |
water is added, water systems are operated and checked for leaks |
C-9.05.09P |
repair leaks |
leaks are repaired according to requirements |
C-9.05.10P |
add aggregates and decorative features |
aggregates and decorative features are added according to design |
C-9.05.11P |
verify and adjust water flow |
water flow is verified and adjusted to optimize performance, sound and aesthetics |
C-9.05.12P |
drain water and clean all components |
components are drained of water and cleaned according to industry standards |
C-9.05.13P |
refill water features and add ecosystem enhancement products |
water features are refilled and ecosystem enhancement products are added according to manufacturers' specifications |
C-9.05.14P |
place aquatic plants and fish |
aquatic plants and fish are placed according to design |
C-9.05.15P |
verify installation |
installation meets specifications |
C-9.05.16P |
clean and repair construction access |
construction access is cleaned and repaired according to task requirements |
C-9.05.17P |
dispose of, or recycle, excess materials |
excess materials are disposed of, or recycled, according to jurisdictional regulations |
Range of Variables
- tools and equipment include: shovels, picks, chisels, wheelbarrows, excavators, loaders, skid-steers
- water supply components include: pumps, drains, valves, filtration systems, electrical conduits
- aggregates and decorative features include: rocks, garden art, foot bridges
- ecosystem enhancement products include: beneficial bacteria, pH amendments
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-9.05.01L |
demonstrate knowledge of the design, installation of landscape water features |
define terminology associated with water features |
identify types of water features and describe their characteristics and applications |
identify hazards and describe safe work practices pertaining to water features |
describe the implications of water features on the practice of environmental stewardship |
interpret codes and regulations pertaining to water features |
interpret documentation pertaining to water features |
describe the procedures used to prepare site for installation of landscape water features |
describe the procedures used to install landscape water features |
Range of Variables
- documentation includes: flow rates, pipe and pump sizing charts
C-9.06 - Installs low voltage landscape lighting
Essential Skills: Document Use, Working with Others, Numeracy
C-9.06 - Installs low voltage landscape lighting
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-9.06.01P |
select and use tools |
tools are selected and used according to task requirements and manufacturers' specifications |
C-9.06.02P |
perform voltage drop calculation |
voltage drop calculation is performed to confirm operation and desired effects |
C-9.06.03P |
dig or tunnel trenches to depth |
trenches are dug or tunnelled to depth according to specifications |
C-9.06.04P |
store or remove excavated materials |
excavated materials are stored or removed according to industry practices |
C-9.06.05P |
lay out and assemble lighting components |
lighting components are laid out and assembled according to manufacturers’ specifications, lighting plan and industry standards |
C-9.06.06P |
test operation of the lighting system and check voltage |
lighting system is tested for operation and voltage is checked |
C-9.06.07P |
position and secure lighting components into final location |
lighting components are positioned and secured into final location according to lighting plan |
C-9.06.08P |
program lighting controller |
lighting controller is programmed to site and customer requirements |
C-9.06.09P |
adjust fixtures |
fixtures are adjusted for desired effects |
C-9.06.10P |
clean and repair construction access |
construction access is cleaned and repaired according to industry practices |
C-9.06.11P |
backfill trenches with material to finished grade |
trenches are backfilled with material to finished grade according to drawings and specifications |
C-9.06.12P |
dispose of, or recycle, excess materials |
excess materials are disposed of, or recycled, according to jurisdictional regulations |
Range of Variables
- tools include: wire strippers, voltmeters, ladders, trenching shovels
- lighting components include: connectors, conduits, transformers, wires, fixtures, bulbs, solar components
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-9.06.01L |
demonstrate knowledge of the design and installation of low voltage landscape lighting |
define terminology associated with low voltage landscape lighting |
identify types of low voltage landscape lighting and describe their characteristics and applications |
identify components of low voltage landscape lighting |
identify hazards and describe safe work practices pertaining to low voltage landscape lighting |
interpret codes and regulations pertaining to low voltage landscape lighting |
interpret documentation pertaining to low voltage landscape lighting |
describe voltage drop calculation, its application and procedure for use |
describe the procedures used to prepare site for installation of low voltage landscape lighting |
describe the tools and procedures used to install low voltage landscape lighting |
describe the procedures used to estimate quantities of materials required to install low voltage landscape lighting |
Range of Variables
- tools include: wire strippers, voltmeters, ladders, trenching shovels
Task C-10 Installs softscape
Task Descriptor
Landscape horticulturists install softscape features such as growing media, exterior and interior plants as well as seed or sod. All features comply with plans, specifications, regulations and codes to ensure the integrity of the installation.
C-10.01 - Installs growing media
Essential Skills: Working with Others, Thinking, Document Use
C-10.01 - Installs growing media
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-10.01.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-10.01.02P |
verify functioning of drainage systems |
drainage systems are verified to be effective and functioning |
C-10.01.03P |
scarify subsoil |
subsoil is scarified with mechanical and manual tools and equipment according to industry practices |
C-10.01.04P |
move growing media |
growing media is moved to desired location according to drawings and specifications |
C-10.01.05P |
add growing media in lifts and compact |
growing media is added in lifts and compacted according to specifications and CLS |
C-10.01.06P |
add and incorporate amendments |
amendments are added and incorporated according to industry practices and results of soil tests |
C-10.01.07P |
shape and grade growing media |
growing media is shaped and graded to finished grade by mechanical and manual raking according to drawings and specifications |
C-10.01.08P |
verify growing media depth |
growing media depth meets drawings and specifications according to CLS |
C-10.01.09P |
select growing media |
growing media is selected according to project requirements, specifications, landscape requirements, and jurisdictional regulations |
Range of Variables
- tools and equipment include: shovels, picks, rakes, wheelbarrows, skid-steers, loaders, excavators, rollers
- amendments include: fertilizers, composts, peat moss, mycorrhizae
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-10.01.01L |
demonstrate knowledge of the procedures used to install growing media |
identify specific tools and equipment relating to growing media installation and describe their applications and procedures for use |
describe the procedures used for installing growing media |
identify amendments used in the installation of growing media |
describe the procedures used to estimate quantities of materials required to install growing media |
Range of Variables
- tools and equipment include: shovels, picks, rakes, wheelbarrows, skid-steers, loaders, excavators, rollers
- amendments include: fertilizers, composts, peat moss, mycorrhizae
C-10.02 - Installs exterior landscape plants
Essential Skills: Working with Others, Thinking, Document Use
C-10.02 - Installs exterior landscape plants
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-10.02.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-10.02.02P |
prepare plant material |
plant material is prepared by performing activities |
C-10.02.03P |
monitor and maintain plant health |
plant health is monitored and maintained throughout installation process according to industry practices |
C-10.02.04P |
lay out plant material |
plant material is laid out according to drawings and specifications |
C-10.02.05P |
plant, stake and guy plant material |
plant material is planted, staked and guyed according to drawings and specifications, and CLS |
C-10.02.06P |
prune plant material |
plant material is pruned according to industry practices |
C-10.02.07P |
verify moisture content of growing media |
moisture content of growing media is verified |
C-10.02.08P |
verify plant material installation |
plant material installation meets specifications |
C-10.02.09P |
dispose of, or recycle, excess materials |
excess materials are disposed of, or recycled, according to jurisdictional regulations |
C-10.02.10P |
select plant material |
plant material is selected according to project requirements, specifications, landscape requirements, and jurisdictional regulations |
Range of Variables
- tools and equipment include: tree dollies, shovels, rakes, excavators, loaders, attachments
- plant material includes: perennials, shrubs, trees
- activities include: removing containers, scarifying root ball, managing nutrient balance, irrigating plant material
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-10.02.01L |
demonstrate knowledge of the procedures used to install exterior landscape plant material |
identify the considerations for determining suitability of planting site for plant material |
describe the installation procedures for a variety of root preparations and stock types |
describe the procedures used to prepare planting site for tree installation |
describe the procedures used to install trees |
describe the procedures used for post-planting care of trees |
describe the procedures used to prepare planting beds for herbaceous and woody plant material installation |
describe the procedures used to install herbaceous and woody plant material |
describe the procedures used to estimate quantities of plant material required |
C-10.02.02L |
demonstrate knowledge of pruning exterior plant material, the application and procedures for use |
describe the application and procedures used to prune exterior plant material |
C-10.02.03L |
demonstrate knowledge of fertilizers, their application, and procedures for use |
identify types of fertilizers and describe their characteristics and applications |
describe the procedures and equipment used for the application of fertilizers |
C-10.02.04L |
demonstrate knowledge of irrigation equipment and systems, their applications and operation to achieve adequate irrigation |
identify the factors that determine irrigation rates and methods |
Range of Variables
- plant material includes: perennials, shrubs, trees
- considerations include: sun and wind exposure, water availability, quality of growing medium, site accessibility, proximity to buildings and utility services, air quality and pollutants
- stock types include: bare root, ball-and-burlap (B&B), wire basket, containerized, caliper stock
- procedures used to prepare planting site include: excavation, determining planting pit dimensions, amending soil, site drainage
- procedures used to install trees include: placement, loosening of root containment, root placement, backfilling, mulching, machine-planting, stabilizing, fertilizing, protecting tree
- procedures used for post-planting care of trees include: irrigation, pruning, fertilizing, protecting, stabilizing, mulching
- procedures used to prepare planting beds include: bed cultivation, incorporating soil amendment, removal of weeds/debris, bed edging, grading, drainage
- procedures used to install herbaceous and woody plant material includes: bed layout, plant placement, loosening of root containment, root placement, backfilling, irrigation, fertilizing, mulching
- factors include: plant material (growth stage, mature size, water use rate), root zone assessment, soil/water relationship, site conditions, application (time, rate, duration), climate
C-10.03 - Transplants plants
Essential Skills: Working with Others, Thinking, Oral Communication
C-10.03 - Transplants plants
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-10.03.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-10.03.02P |
verify plant is viable for transplant |
viability of plant for transplant is verified according to factors |
C-10.03.03P |
dig plant material |
plant material is dug according to CLS and industry practices |
C-10.03.04P |
install plant material |
plant material is installed according to drawings, specifications and CLS |
C-10.03.05P |
prune plant material |
plant material is pruned according to industry practices |
C-10.03.06P |
apply fertilizer |
fertilizer is applied according to industry practices |
C-10.03.07P |
verify moisture content of growing media |
moisture content of growing media is verified to ensure establishment and plant health according to jurisdictional regulations and CLS |
C-10.03.08P |
irrigate plant material |
plant material is irrigated according to plant requirements |
C-10.03.09P |
dispose of, or recycle, excess materials |
excess materials are disposed of, or recycled, according to jurisdictional regulations |
C-10.03.10P |
prepare plant material for transplanting |
plant material is prepared for transplanting according to industry practices and CLS |
Range of Variables
- tools and equipment include: shovels, tree dollies, tree spades, axes
- factors include: species, health, time of year
- plant material includes: perennials, shrubs, trees
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-10.03.01L |
demonstrate knowledge of transplanting plants |
identify tools and equipment related to transplanting and describe their applications and procedures for use |
identify the factors for determining viability of plant for transplanting |
describe the application and procedures for transplanting plants |
describe irrigation rates and methods and fertilization requirements for transplanted plants |
describe the application and procedures used to prune transplanted plants |
Range of Variables
- tools and equipment include: shovels, tree dollies, tree spades, axes
- factors include: species, health, time of year
C-10.04 - Installs mulch
Essential Skills: Numeracy, Working with Others, Document Use
C-10.04 - Installs mulch
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-10.04.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-10.04.02P |
verify that area to be mulched is prepared |
area to be mulched is prepared according to drawings and specifications |
C-10.04.03P |
install landscape fabric for aggregate |
landscape fabric is installed according to industry practices and CLS |
C-10.04.04P |
verify mulch materials |
mulch materials meet specifications, CLS and jurisdictional regulations |
C-10.04.05P |
apply mulch |
mulch is applied according to industry practices, CLS and jurisdictional regulations |
C-10.04.06P |
verify mulch installation |
mulch installation meets specifications, CLS and jurisdictional regulations |
Range of Variables
- tools and equipment include: wheelbarrows, bow rakes, pitch forks, loaders, skid-steers, blower trucks
- mulch materials include: shredded bark, aggregates, composts
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-10.04.01L |
demonstrate knowledge of mulch materials, the application and procedures for use |
identify types of mulch materials and their application |
describe the procedures used to apply mulch materials |
describe the procedures used to estimate quantities of mulch materials required |
Range of Variables
- mulch materials include: shredded bark, aggregates, composts
C-10.05 - Installs turf from seed
Essential Skills: Numeracy, Working with Others, Document Use
C-10.05 - Installs turf from seed
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-10.05.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-10.05.02P |
verify seedbed is prepared and add amendments |
seedbed is prepared and amendments are added according to specifications |
C-10.05.03P |
select seed variety and seeding rate |
seed variety and seeding rate are selected to meet project requirements |
C-10.05.04P |
apply seed to prepared area |
seed is applied according to specifications and weather conditions |
C-10.05.05P |
use landscape rollers |
landscape rollers are used to ensure seed is in direct contact with growing media according to specifications and industry practices |
C-10.05.06P |
verify seed distribution |
seed distribution is verified to result in uniform turf according to visual inspection, seed count and cross-directional seeding |
C-10.05.07P |
apply organic matter |
organic matter is applied according to specifications to retain moisture and minimize seed movement |
C-10.05.08P |
irrigate and monitor turf regularly |
turf is monitored and irrigation meets germination requirements according to jurisdictional regulations |
Range of Variables
- tools and equipment include: landscape rollers, landscape rakes, seed spreaders, hydro-seeders, seed drills, tractors and attachments
- amendments include: fertilizers, composts, peat moss, coir, lime, sulphur, mycorrhizae
- organic matter includes: hydro mulch, straw, compost
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-10.05.01L |
demonstrate knowledge of turf establishment from seed and installation procedures |
identify the considerations when selecting turf seed types |
identify calculations required for determining seed quantities |
describe the procedures used to establish turf from seed |
identify the methods used for post-establishment care of seeded turf |
Range of Variables
- considerations include: environmental conditions, site use, cultural requirements
C-10.06 - Installs sod
Essential Skills: Working with Others, Oral Communication, Numeracy
C-10.06 - Installs sod
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-10.06.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-10.06.02P |
verify that area to be sodded is prepared |
area to be sodded is prepared according to drawings and specifications |
C-10.06.03P |
verify selected sod |
selected sod meets specifications and CLS |
C-10.06.04P |
apply amendments |
amendments are applied according to specifications and industry practices |
C-10.06.05P |
lay sod |
sod is laid according to drawings and specifications and industry practices |
C-10.06.06P |
secure sod |
sod is secured to slope according to drawings, specifications and industry practices |
C-10.06.07P |
use landscape rollers |
landscape rollers are used to ensure roots are in direct contact with growing media according to industry practices |
C-10.06.08P |
irrigate and monitor sod regularly |
sod is irrigated and monitored according to requirements and jurisdictional regulations |
C-10.06.09P |
verify sod installation |
sod installation meets drawings and specifications |
C-10.06.10P |
dispose of, or recycle, excess materials |
excess materials are disposed of, or recycled, according to jurisdictional regulations |
Range of Variables
- tools and equipment include: landscape rakes, sod knives, tractors and attachments, landscape rollers
- amendments include: fertilizers, composts, peat moss, lime, sulphur, coir, mycorrhizae
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-10.06.01L |
demonstrate knowledge of turf establishment from seed and installation procedures |
identify the considerations when selecting turf seed types |
identify calculations required for determining sod quantities |
describe the procedures used to install sod |
describe the procedures used to establish turf by sodding |
identify the methods used for post-establishment care of sod |
Range of Variables
- considerations include: environmental conditions, site use, cultural requirements
C-10.07 - Installs interior landscape plants
Essential Skills: Document Use, Working with Others, Oral Communication
C-10.07 - Installs interior landscape plants
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-10.07.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-10.07.02P |
prepare plant material |
plant material is prepared by performing activities according to industry practices |
C-10.07.03P |
monitor and maintain plant health |
plant health is monitored and maintained throughout installation process according to industry practices |
C-10.07.04P |
protect interior furnishings and surfaces |
interior furnishings and surfaces are protected according to industry practices and contract documents |
C-10.07.05P |
lay out plant material |
plant material is laid out according to drawings and specifications |
C-10.07.06P |
plant interior landscape plants |
interior landscape plants are planted according to drawings and specifications |
C-10.07.07P |
prune plant material |
plant material is pruned according to plant and site requirements |
C-10.07.08P |
irrigate plant material |
plant material is irrigated according to plant requirements |
C-10.07.09P |
verify moisture content of growing media |
moisture content of growing media meets specifications |
C-10.07.10P |
verify plant installation |
plant installation meets specifications |
Range of Variables
- tools and equipment include: tree dollies, shovels, rakes, skid-steers, tree gantries
- activities include: foliar washing, scarifying root ball, managing nutrient balance
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-10.07.01L |
demonstrate knowledge of the procedures used to install interior landscape plants |
identify tools and equipment relating to plant material installation |
identify the considerations for determining suitability of planting site for plant material |
describe the installation procedures for a variety of root preparations and stock types |
describe the procedures used to prepare planting beds for herbaceous and woody plant material installation |
describe the procedures used to install herbaceous and woody plant material |
C-10.07.02L |
demonstrate knowledge of pruning interior landscape plants |
describe the application and procedures used to prune interior landscape plants |
C-10.07.03L |
demonstrate knowledge of fertilizers, their application and procedures for use |
identify types of fertilizers and describe their characteristics and applications |
describe the procedures and equipment used for the application of fertilizers |
C-10.07.04L |
demonstrate knowledge of irrigation equipment and systems, their applications and operation |
identify the factors that determine irrigation rates and methods |
Range of Variables
- tools and equipment include: tree dollies, shovels, rakes, skid-steers, tree gantries
- considerations include: sun and light exposure, water availability, quality of growing medium, site accessibility, air quality and pollutants
- procedures used to prepare planting beds include: bed cultivation, amending soil, removal of weeds/debris, bed edging, grading and drainage
- procedures used to install herbaceous and woody plant material include: transporting plants, bed layout, plant placement, loosening of root containment, root placement, backfilling, irrigation, fertilizing, mulching
- factors include: plant material (growth stage, mature size, water use rate), root zone assessment, soil/water relationship, site conditions, application (time, rate, duration), climate
Task C-11 Installs green infrastructure systems
Task Descriptor
Landscape horticulturists install green infrastructure features. These features comply with drawings, specifications, regulations and codes to ensure the integrity of the systems.
C-11.01 - Selects green infrastructure
Essential Skills: Continuous Learning, Working with Others, Thinking
C-11.01 - Selects green infrastructure
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
no |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-11.01.01P |
determine green infrastructure needs by inspecting site-specific environmental conditions |
green infrastructure needs are identified |
C-11.01.02P |
consider factors affecting the selection of green infrastructure |
factors affecting the selection of green infrastructure are considered |
C-11.01.03P |
identify benefits and applications of green infrastructure technologies |
benefits and applications of green infrastructure technologies mimic nature for selection according to site requirements |
C-11.01.04P |
select green infrastructure technologies, methods and products |
green infrastructure technologies, methods and products are selected taking into consideration the client’s needs, site conditions, product availability and jurisdictional regulations |
Range of Variables
- site-specific environmental conditions include: topography, water flow, drainage patterns, humidity, air flow, existing vegetation, growing media, precipitation rates, existing waterways
- factors affecting the selection of green infrastructure include: budget, community plan, jurisdictional regulations, equipment access
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-11.01.01L |
demonstrate knowledge of green infrastructure principles |
describe types of green infrastructure |
describe types of blue and grey infrastructures |
identify purpose and benefits of green infrastructures |
identify benefits of plants |
identify xeriscape principles |
identify value of environmental, economic and social impact of urban forests |
define natural ecosystems’ functions, purpose and structure |
define ecosystem service benefits |
C-11.01.02L |
demonstrate knowledge of green infrastructure practices |
identify jurisdictional regulations related to green infrastructure |
describe green field and brown field reclamation |
describe smart water technology |
define site sustainability |
explain landscape design, development process and aesthetics |
identify surface and subsurface drainage systems and practices |
describe filtration systems |
explain low impact development |
Range of Variables
- green infrastructure includes: living walls, green roofs, rain gardens, rainwater management, stormwater management, green parking, permeable pavement, bioswales, urban forests
- benefits of green infrastructures include: biodiversity, water conservation, rain/stormwater management, climate change mitigation, air purification, reduced heat island effect, protecting natural resources
- benefits of plants include: carbon sequestration, symbiotic relationships, pollution mitigation, cost savings
- surface and subsurface drainage systems and practices include: roof-top gardens, catch basins, bioswales, bioretention ponds
C-11.02 - Installs green roofs and walls
Essential Skills: Document Use, Thinking, Working with Others
C-11.02 - Installs green roofs and walls
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
no |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-11.02.01P |
select tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-11.02.02P |
prepare work area |
work area is prepared in accordance with contract documents, industry standards, manufacturers’ specifications and jurisdictional regulations |
C-11.02.03P |
install roofing and wall non-organic components |
roofing and wall non-organic components are installed according to manufacturers’ specifications, industry standards and contract documents |
C-11.02.04P |
install growing media |
growing media is installed according to manufacturers’ specifications, industry standards and contract documents |
C-11.02.05P |
install plant material |
plant material is installed according to manufacturers’ specifications, industry standards, contract documents and CLS |
C-11.02.06P |
comply with safe working procedures |
safe working conditions are applied in accordance with jurisdictional regulations and company policies |
Range of Variables
- tools and equipment include: lifts, booms, cranes, fall protection equipment
- non-organic components include: membranes, root barriers, drainage, irrigation, pumps
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-11.02.01L |
demonstrate knowledge of process and procedures of the installation of green roofs and walls |
describe the process and procedures when installing green roofs and walls |
identify the non-organic components of green roofs and walls |
describe the characteristics of growing media used in green roofs and walls |
describe the characteristics of plant material used in green roofs and walls |
C-11.02.02L |
demonstrate knowledge of types and functions of plants used on green roofs and walls |
identify plants used on green roofs and walls and describe their functions |
C-11.02.03L |
demonstrate knowledge of growing media and walls used on green roofs |
describe characteristics of growing media used on green roofs and walls |
C-11.02.04L |
demonstrate knowledge of components of green roofs and walls |
describe the components of green roofs and walls |
C-11.02.05L |
demonstrate knowledge of site safety |
describe fall protection procedures with regulations |
Range of Variables
- non-organic components include: membranes, root barriers, drainage, irrigation, pumps
- components include: vegetation, growing media, water retention mats, membrane, drainage, structural support, irrigation systems
C-11.03 - Installs rainwater and stormwater management systems
Essential Skills: Thinking, Document Use, Continuous Learning
C-11.03 - Installs rainwater and stormwater management systems
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-11.03.01P |
select tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-11.03.02P |
prepare work area |
work area is prepared in accordance with contract documents, industry standards and manufacturers’ specifications |
C-11.03.03P |
install rainwater and stormwater harvesting components |
rainwater and stormwater harvesting components are installed according to manufacturers’ specifications, industry standards and contract documents |
C-11.03.04P |
install stormwater management systems |
stormwater management systems are installed according to contract documents and industry standards |
C-11.03.05P |
install rainwater and stormwater retention systems |
rainwater and stormwater retention systems are installed according to contract documents and industry standards |
C-11.03.06P |
install growing media |
growing media is installed according to manufacturers’ specifications, industry standards and contract documents |
C-11.03.07P |
install plant material |
plant material is installed according to industry standards and contract documents |
Range of Variables
- rainwater and stormwater harvesting components include: cisterns, pumps, hoses, valves, pipes, aggregates, rain barrels, tanks, irrigation systems
- stormwater management systems include: bioswales, bioretention ponds, engineered wetlands, rain gardens, permeable pavement
- rainwater and stormwater retention systems include: retention ponds, green roof, permeable pavement
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-11.03.01L |
demonstrate knowledge of rainwater harvesting systems |
describe functions of rainwater harvesting systems |
C-11.03.02L |
demonstrate knowledge of rainwater and stormwater harvesting components and stormwater management systems |
identify the rainwater and stormwater harvesting components |
identify codes and regulations pertaining to rainwater and stormwater management systems |
describe the characteristics of growing media used in green roofs and walls |
C-11.03.03L |
demonstrate knowledge of retention systems |
identify the components of retention systems |
C-11.03.04L |
demonstrate knowledge of the process and procedures for the installation of rainwater and stormwater management systems |
describe the process and procedures when installing rainwater and stormwater management systems |
C-11.03.05L |
demonstrate knowledge of the benefits of rainwater and stormwater management systems |
describe the benefits of rainwater and stormwater management systems |
Range of Variables
- rainwater and stormwater harvesting components include: cisterns, pumps, hoses, valves, pipes, aggregates, rain barrels, tanks, irrigation systems
- stormwater management systems include: bioswales, bioretention ponds, engineered wetlands, rain gardens, permeable pavement
C-11.04 - Installs erosion control material
Essential Skills: Document Use, Working with Others, Oral Communication
C-11.04 - Installs erosion control material
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-11.04.01P |
select tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-11.04.02P |
move specified erosion control material |
specified erosion control material is moved into desired location according to drawings, specifications and industry practices |
C-11.04.03P |
place erosion control material |
erosion control material is placed according to drawings, specifications and industry practices |
C-11.04.04P |
secure placement of erosion control material |
erosion control material is secured to ensure stability according to drawings, specifications and industry practices |
C-11.04.05P |
verify erosion control material installation |
erosion control material installation meets specifications |
C-11.04.06P |
dispose of, or recycle, excess materials |
excess materials are disposed of, or recycled, according to jurisdictional regulations |
Range of Variables
- tools and equipment include: shovels, post pounders, knives, augers, trenchers, loaders
- erosion control material includes: roll-type materials (tarps, mats, blankets), aggregates, plant material, silt fences, boulders, wattles
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-11.04.01L |
demonstrate knowledge of erosion control material and procedures for installation |
identify erosion control material and their application |
describe the methods of erosion control |
describe installation methods |
describe the procedures used to estimate quantities of erosion control material required |
Range of Variables
- erosion control material includes: roll-type materials (tarps, mats, blankets), aggregates, plant material, silt fences, boulders, wattles
C-11.05 - Installs biodiverse plantings and natural areas
Essential Skills: Document Use, Working with Others, Thinking
C-11.05 - Installs biodiverse plantings and natural areas
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
yes |
NV |
NV |
NV |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
C-11.05.01P |
select tools and equipment |
tools and equipment are selected and used according to task requirements and manufacturers' specifications |
C-11.05.02P |
prepare planting area |
planting area is prepared according to contract documents and industry standards |
C-11.05.03P |
lay out plant material |
plant material is laid out according to contract documents |
C-11.05.04P |
install plant material |
plant material is installed according to contract documents and CLS |
C-11.05.05P |
install organic mulch |
organic mulch is installed according to contract documents and CLS |
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
C-11.05.01L |
demonstrate knowledge of biodiverse plantings and natural areas |
describe the function of biodiverse plantings and natural areas |
describe the benefits of biodiverse plantings and natural areas |
identify regulations pertaining to biodiverse plantings and natural areas |
C-11.05.02L |
demonstrate knowledge of the quality standard of plant material used for biodiverse plantings and natural areas |
identify characteristics of plant material used for biodiverse plantings and natural areas |
Range of Variables
- benefits include: animal habitat, refugia for organisms, biodiversity, psychosocial health, preservation of natural resources