Appendix F – Task Profile Chart

Block A – Occupational Skills

1. Interprets occupational documentation.

  • 1.01 Interprets drawings and specifications.
  • 1.02 Interprets standards, regulations and procedures.

2. Communicates in the workplace.

  • 2.01 Communicates with co-workers.
  • 2.02 Communicates with others.
  • 2.03 Communicates with apprentices.
  • 2.04 Uses hand signals.
  • 2.05 Communicates electronically.

3. Uses and maintains tools and equipment.

  • 3.01 Uses hand tools and measuring equipment.
  • 3.02 Uses power tools.
  • 3.03 Uses bending tools and equipment.
  • 3.04 Uses powder-actuated tools.
  • 3.05 Uses aerial work platforms.
  • 3.06 Uses ladders.
  • 3.07 Uses scaffolding.
  • 3.08 Uses personal protective equipment (PPE).
  • 3.09 Uses surveying equipment.
  • 3.10 Uses welding equipment.
  • 3.11 Uses thermal and oxy-fuel cutting equipment.

4. Organizes work.

  • 4.01 Organizes materials and supplies.
  • 4.02 Marks layouts.
  • 4.03 Maintains safe work environment.
  • 4.04 Assesses site hazards.
  • 4.05 Plans work tasks.

Block B – Rigging and Hoisting

5. Selects rigging equipment.

  • 5.01 Matches load to lift capability.
  • 5.02 Inspects rigging equipment.
  • 5.03 Maintains rigging equipment.

6. Uses hoisting and lifting equipment.

  • 6.01 Uses hoisting equipment.
  • 6.02 Uses lifting equipment.
  • 6.03 Attaches rigging to load.

Block C – Cranes

7. Select, assemble and erect cranes and components.

  • 7.01 Assesses crane site limitations.
  • 7.02 Determines crane position.
  • 7.03 Prepares bases.
  • 7.04 Erects cranes and components.

8. Disassembles cranes.

  • 8.01 Disassembles crane components.
  • 8.02 Prepares crane for transport.

Block D – Reinforcing

9. Fabricates on-site.

  • 9.01 Cuts material.
  • 9.02 Bends material.

10. Installs reinforcing material.

  • 10.01 Places reinforcing material.
  • 10.02 Ties material.
  • 10.03 Joins material.

Block E – Pre-Stresses/Post-Tensions

11. Places pre-stressed/post-tensioning systems.

  • 11.01 Lays out profile.
  • 11.02 Places tendons and accessories.
  • 11.03 Installs bursting steel and anchorages.
  • 11.04 Connects tendons to anchors.
  • 11.05 Protects exposed tendons.

12. Stresses tendons.

  • 12.01 Sets up stressing equipment.
  • 12.02 Tensions tendons.
  • 12.03 Cuts and caps tendons.
  • 12.04 Removes stressing equipment.
  • 12.05 De-stresses tendons.

13. Grouts tendons.

  • 13.01 Sets up grouting equipment.
  • 13.02 Installs grouts.

Block F – Erection, Assembly and Installation

14. Installs primary and secondary structural members.

  • 14.01 Erects falsework.
  • 14.02 Attaches structural members.
  • 14.03 Levels, plumbs and aligns structural members.
  • 14.04 Completes installation of structural members.

15. Installs ornamental components and systems.

  • 15.01 Installs curtain walls and window walls.
  • 15.02 Installs miscellaneous components.

16. Installs conveyors, machinery and equipment.

  • 16.01 Installs material handling systems.
  • 16.02 Aligns material handling systems.
  • 16.03 Places machinery and equipment.

Block G – Maintenance and Upgrading

17. Repairs components.

  • 17.01 Assesses current condition of components.
  • 17.02 Field-fabricates components.
  • 17.03 Replaces components.
  • 17.04 Performs preventative maintenance.

18. Dismantles and removes structural, mechanical and miscellaneous components.

  • 18.01 Ensures decommissioning of structure or components.
  • 18.02 Plans sequence of disassembly.
  • 18.03 Removes components.