Appendix F – Task Profile Chart
Block A – Occupational Skills
1. Interprets occupational documentation.
- 1.01 Interprets drawings and specifications.
- 1.02 Interprets standards, regulations and procedures.
2. Communicates in the workplace.
- 2.01 Communicates with co-workers.
- 2.02 Communicates with others.
- 2.03 Communicates with apprentices.
- 2.04 Uses hand signals.
- 2.05 Communicates electronically.
3. Uses and maintains tools and equipment.
- 3.01 Uses hand tools and measuring equipment.
- 3.02 Uses power tools.
- 3.03 Uses bending tools and equipment.
- 3.04 Uses powder-actuated tools.
- 3.05 Uses aerial work platforms.
- 3.06 Uses ladders.
- 3.07 Uses scaffolding.
- 3.08 Uses personal protective equipment (PPE).
- 3.09 Uses surveying equipment.
- 3.10 Uses welding equipment.
- 3.11 Uses thermal and oxy-fuel cutting equipment.
4. Organizes work.
- 4.01 Organizes materials and supplies.
- 4.02 Marks layouts.
- 4.03 Maintains safe work environment.
- 4.04 Assesses site hazards.
- 4.05 Plans work tasks.
Block B – Rigging and Hoisting
5. Selects rigging equipment.
- 5.01 Matches load to lift capability.
- 5.02 Inspects rigging equipment.
- 5.03 Maintains rigging equipment.
6. Uses hoisting and lifting equipment.
- 6.01 Uses hoisting equipment.
- 6.02 Uses lifting equipment.
- 6.03 Attaches rigging to load.
Block C – Cranes
7. Select, assemble and erect cranes and components.
- 7.01 Assesses crane site limitations.
- 7.02 Determines crane position.
- 7.03 Prepares bases.
- 7.04 Erects cranes and components.
8. Disassembles cranes.
- 8.01 Disassembles crane components.
- 8.02 Prepares crane for transport.
Block D – Reinforcing
9. Fabricates on-site.
- 9.01 Cuts material.
- 9.02 Bends material.
10. Installs reinforcing material.
- 10.01 Places reinforcing material.
- 10.02 Ties material.
- 10.03 Joins material.
Block E – Pre-Stresses/Post-Tensions
11. Places pre-stressed/post-tensioning systems.
- 11.01 Lays out profile.
- 11.02 Places tendons and accessories.
- 11.03 Installs bursting steel and anchorages.
- 11.04 Connects tendons to anchors.
- 11.05 Protects exposed tendons.
12. Stresses tendons.
- 12.01 Sets up stressing equipment.
- 12.02 Tensions tendons.
- 12.03 Cuts and caps tendons.
- 12.04 Removes stressing equipment.
- 12.05 De-stresses tendons.
13. Grouts tendons.
- 13.01 Sets up grouting equipment.
- 13.02 Installs grouts.
Block F – Erection, Assembly and Installation
14. Installs primary and secondary structural members.
- 14.01 Erects falsework.
- 14.02 Attaches structural members.
- 14.03 Levels, plumbs and aligns structural members.
- 14.04 Completes installation of structural members.
15. Installs ornamental components and systems.
- 15.01 Installs curtain walls and window walls.
- 15.02 Installs miscellaneous components.
16. Installs conveyors, machinery and equipment.
- 16.01 Installs material handling systems.
- 16.02 Aligns material handling systems.
- 16.03 Places machinery and equipment.
Block G – Maintenance and Upgrading
17. Repairs components.
- 17.01 Assesses current condition of components.
- 17.02 Field-fabricates components.
- 17.03 Replaces components.
- 17.04 Performs preventative maintenance.
18. Dismantles and removes structural, mechanical and miscellaneous components.
- 18.01 Ensures decommissioning of structure or components.
- 18.02 Plans sequence of disassembly.
- 18.03 Removes components.