Table of Contents
Task G-22 Prepares and builds roads
Task Descriptor
The first step of road construction is to prepare earth for the right of way. Construction craft workers work with machines to place and compact sub-base, base and surface materials. They manually spread, shovel and rake asphalt where the machines cannot operate. They also apply adhesives and primers and modify and repair all road surfaces.
G-22.01 - Prepares earth for right of way
G-22.01 - Prepares earth for right of way
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
NV |
yes |
NV |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
ND |
NV |
ND |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
G-22.01.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
G-22.01.02P |
assist surveyors with land markers |
land markers are placed to define right of way |
G-22.01.03P |
clear right of way areas |
right of way areas are cleared of obstructions |
G-22.01.04P |
tend to heavy equipment operator needs |
heavy equipment operator needs are tended to |
G-22.01.05P |
set grades and direct heavy equipment operator |
grades are set according to design specifications and heavy equipment operator is directed |
Range of Variables (include, but not limited to)
- tools and equipment: shovels, rakes, picks, chainsaws, pry bars, wheelbarrows, sledgehammers, GPS, lasers, optical levels, total stations
- land markers: benchmarks, offset stakes, standard iron bars, monuments
- obstructions: trees, brush, rock
- heavy equipment operator needs: supply of fuel and lubricants, basic maintenance of equipment, supply data
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
G-22.01.01L |
demonstrate knowledge of procedures to prepare earth for right of way |
- identify tools and equipment used to prepare earth for right of way, and describe their procedures for use
- describe procedures to prepare earth for right of way
- describe land markers for surveying
- identify heavy equipment operator needswhile preparing earth for right of way
|
G-22.01.02L |
demonstrate knowledge of sustainability and environmental stewardship practices |
- identify practices that contribute to environmental protection
|
Range of Variables (include, but not limited to)
- tools and equipment: shovels, rakes, picks, chainsaws, pry bars, wheelbarrows, sledgehammers, GPS, lasers, optical levels, total stations
- land markers: benchmarks, offset stakes, standard iron bars, monuments
- heavy equipment operator needs: supply of fuel and lubricants, basic maintenance of equipment, supply data
G-22.02 - Places layers and road surface materials for roadwork
G-22.02 - Places layers and road surface materials for roadwork
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
NV |
yes |
NV |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
ND |
NV |
ND |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
G-22.02.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
G-22.02.02P |
prepare and compact sub-base and layers |
sub-base and layers are prepared and compacted according to grade |
G-22.02.03P |
apply adhesives and primers |
adhesives and primersare applied according to specifications |
G-22.02.04P |
place, lay, spread, rake and compact road surfacing material |
road surfacing material is placed, laid, spread, raked and compacted to finish-grade according to engineered specifications |
G-22.02.05P |
feather and finish around maintenance holes, catch basins and curbs |
maintenance holes, catch basins and curbs are feathered and finished according to road surfacing material being used |
G-22.02.06P |
finish concrete to required surface |
concrete is finished to required surface according to engineered specifications |
Range of Variables (include, but not limited to)
- tools and equipment: compacting equipment, hand compactors, bull floats, hand floats, shovels, rakes (grading, landscaping, concrete placer), picks, sledgehammers, wheelbarrows
- adhesives and primers: concrete bonding adhesives, concrete primers, tack
- road surfacing materials: concrete, asphalt, composite materials, interlocking brick, chip seal
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
G-22.02.01L |
demonstrate knowledge of road layers, sub-base, and road surfacing materials, their characteristics and applications |
- describe road sub-bases and layers, and describe their characteristics and applications
- identify types of road surfacing materials, and describe their characteristics and applications
- identify types of materials used to prepare road sub-base and layers
- interpret information pertaining to road layers, sub-base, and road surfacing materials found on drawings and specifications
|
G-22.02.02L |
demonstrate knowledge of procedures to place sub-bases, layers and road surfacing materials |
- identify tools and equipment used to place sub-bases, layers and road surfacing materials, and describe their procedures for use
- describe procedures to prepare and compact sub-bases and layers
- describe procedures to place road surfacing materials
|
G-22.02.03L |
demonstrate knowledge of sustainability and environmental stewardship practices |
- identify practices that contribute to environmental protection
|
Range of Variables (include, but not limited to)
- road surfacing materials: concrete, asphalt, composite materials, interlocking brick, chip seal
- types of materials used to prepare sub-base and layers: geotextiles, gravel, riprap, sand, crushed stone, cementitious materials (e.g., dry pack, flowable fill [fillcrete/flowcrete])
- tools and equipment: compacting equipment, hand compactors, bull floats, hand floats, shovels, rakes (grading, landscaping, concrete placer), picks, sledgehammers, wheelbarrows
G-22.03 - Repairs road surfaces
G-22.03 - Repairs road surfaces
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
NV |
yes |
NV |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
ND |
NV |
ND |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
G-22.03.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
G-22.03.02P |
cut road surfacing materials to install utilities and components |
road surfacing materials are cut to install utilities and components |
G-22.03.03P |
repair defects |
defects are repaired according to specifications |
G-22.03.04P |
break surface materials and remove debris |
surface materials are broken, and debris is removed to prepare for resurfacing |
G-22.03.05P |
compact base, drill into existing concrete and install dowels using adhesives |
base is compacted, existing concrete is drilled into, and dowels are installed using adhesives according to engineered specifications |
G-22.03.06P |
place, lay, spread, rake and compact road surfacing material |
road surfacing material is placed, laid, spread, raked and compacted according to engineered specifications |
G-22.03.07P |
apply adhesives and primers to potholes |
adhesives and primers are applied to potholes to prepare for fill materials |
G-22.03.08P |
cut cracks, remove debris and seal joints using sealants |
cracks are cut, debris is removed using media blasting equipment and compressor, and joints are sealed using sealants according to engineered specifications |
Range of Variables (include, but not limited to)
- tools and equipment: shovels, wheelbarrows, saws (quick-cut, walk-behind, up-cut flat, road), jackhammers, hand tampers, plate tampers, rollers, media blasting equipment, compressors, tape, fluorescent paint, road reflectors
- road surfacing materials: concrete, asphalt, composite materials, interlocking brick, chip seal
- utilities and components: pressure pads/sensors, conduit, engineering plates
- defects: potholes, cracks, washouts, heaved areas
- adhesives and primers: tack, concrete bonding agents
- fill materials: gravel, asphalt, concrete, specialty materials
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
G-22.03.01L |
demonstrate knowledge of materials used for road repairs, their characteristics and applications |
- identify types of road surfacing materials, and describe their characteristics and applications
- identify types of fill materials, and describe their characteristics and applications
- identify types of adhesives and primers
- interpret information pertaining to fill materials and road surfacing materials found on drawings and specifications
|
G-22.03.02L |
demonstrate knowledge of procedures to repair road surfaces |
- identify tools and equipment used to repair road surfaces, and describe their procedures for use
- identify types of defects requiring repair
- describe procedures to prepare road surfaces for repairs
- describe procedures to repair road surfaces
- describe procedures to dispose of road debris
|
G-22.03.03L |
demonstrate knowledge of sustainability and environmental stewardship practices |
- identify practices that contribute to environmental protection
|
Range of Variables (include, but not limited to)
- road surfacing materials: concrete, asphalt, composite materials, interlocking brick, chip seal
- fill materials: gravel, asphalt, concrete, specialty materials
- adhesives and primers: tack, concrete bonding agents
- tools and equipment: shovels, wheelbarrows, saws (quick-cut, walk-behind, up-cut flat, road), jackhammers, hand tampers, plate tampers, rollers, media blasting equipment, compressors, tape, fluorescent paint, road reflectors
- defects: potholes, cracks, washouts, heaved areas
Task G-23 Installs roadwork components
Task Descriptor
Construction craft workers are required to install barriers, road markings, signs, culverts and temporary components. Additional certification may be required for the installation of roadwork signage. Safety is of the utmost importance when working on roadwork construction.
G-23.01 - Installs barriers
G-23.01 - Installs barriers
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
NV |
yes |
NV |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
ND |
NV |
ND |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
G-23.01.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task and manufacturers’ specifications |
G-23.01.02P |
select barriers |
barriers are selected according to regulations and specifications |
G-23.01.03P |
determine locations for barriers |
locations for barriers are determined according to regulations and specifications |
G-23.01.04P |
secure water-filled and sand-filled barriers |
water-filled and sand-filled barriers are secured using anchors and fasteners |
Range of Variables (include, but not limited to)
- tools and equipment: forklifts, drills, pry bars, post augers, rigging, boom trucks, skid steers
- barriers: pedestrian, guardrails, jersey (no post), cones, candlesticks
- anchors and fasteners: dowels, concrete piles, cables
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
G-23.01.01L |
demonstrate knowledge of barriers, their characteristics and applications |
- identify types of barriers and describe their characteristics and applications
- identify types of materials used for barriers and describe their characteristics and applications
- identify types of anchors and fasteners used to secure barriers and describe their characteristics and applications
- interpret information pertaining to barriers found on drawings and specifications
|
G-23.01.02L |
demonstrate knowledge of procedures to install barriers |
- identify tools and equipment used to install barriers and describe their procedures for use
- describe procedures to install barriers
|
G-23.01.03L |
demonstrate knowledge of training and certification requirements to install barriers |
- identify training and certification requirements to install barriers
|
G-23.01.04L |
demonstrate knowledge of regulatory requirements pertaining to installation of barriers |
- identify codes, industry standards and regulations pertaining to installation of barriers
|
Range of Variables (include, but not limited to)
- barriers: pedestrian, guardrails, jersey (no post), cones, candlesticks
- applications (of barriers): temporary, permanent
- materials used for barriers: concrete, steel, wood, plastic
- anchors and fasteners: dowels, concrete piles, cables
- tools and equipment: forklifts, drills, pry bars, post augers, rigging, boom trucks, skid steers
G-23.02 - Installs road markings and signs
G-23.02 - Installs road markings and signs
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
NV |
yes |
NV |
yes |
NV |
yes |
yes |
yes |
no |
yes |
ND |
NV |
ND |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
G-23.02.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
G-23.02.02P |
place, paint or adhere permanent and temporary road markings and signs |
permanent and temporary road markings and signs are placed, painted or adhered according to jurisdictional regulations and engineered specifications |
G-23.02.03P |
auger (bore) and backfill signpost holes |
signpost holes are augered (bored) and backfilled to secure in place |
Range of Variables (include, but not limited to)
- tools and equipment: measuring tapes, post augers, sledgehammers, road sign banders, access equipment, wrenches
- road markings: reflective tape, painted lines
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
G-23.02.01L |
demonstrate knowledge of road markingsand signs, their characteristics and applications |
- identify types of road markings, and describe their characteristics and applications
- identify types of signs, and describe their characteristics and applications
- interpret information pertaining to road markings and signs found on drawings and specifications
|
G-23.02.02L |
demonstrate knowledge of procedures to install road markings and signs |
- identify tools and equipment used to install road markings and signs, and describe their procedures for use
- describe procedures to install road markings and signs
|
G-23.02.03L |
demonstrate knowledge of training and certification requirements to install road markings and signs |
- identify training and certification requirements to install road markings and signs
|
G-23.02.04L |
demonstrate knowledge of regulatory requirements pertaining to installation of road markings and signs |
- identify codes, industry standards and regulations pertaining to installation of road markings and signs
|
Range of Variables (include, but not limited to)
- road markings: reflective tape, painted lines
- tools and equipment: measuring tapes, post augers, sledgehammers, road sign banders, access equipment, wrenches
G-23.03 - Installs culverts
G-23.03 - Installs culverts
NL |
NS |
PE |
NB |
QC |
ON |
MB |
SK |
AB |
BC |
NT |
YT |
NU |
NV |
yes |
NV |
yes |
NV |
yes |
yes |
yes |
yes |
yes |
ND |
NV |
ND |
Skills
Reference Code |
Performance Criteria |
Evidence of Attainment |
G-23.03.01P |
select and use tools and equipment |
tools and equipment are selected and used according to task |
G-23.03.02P |
assemble culvert sections |
culvert sections are assembled using connecting methods according to manufacturers’ specifications |
G-23.03.03P |
install and compact bedding for culverts |
bedding for culverts are installed and compacted to achieve required grade and to ensure drainage |
G-23.03.04P |
backfill and secure culvert |
culvert is backfilled and secured according to engineered specifications |
Range of Variables (include, but not limited to)
- tools and equipment: wrenches, levels, shovels, wheelbarrows, skid steers, mini excavators, plate tampers, jumping jacks
- culverts: galvanized steel, plastic, concrete
- connection methods: bell and spigot, clamped and butted
Knowledge
Reference Code |
Learning Outcomes |
Learning Objectives |
G-23.03.01L |
demonstrate knowledge of culverts, their characteristics and applications |
- identify types and sizes of culverts, and describe their characteristics and applications
- interpret information pertaining to culverts found on drawings and specifications
|
G-23.03.02L |
demonstrate knowledge of procedures to install culverts |
- identify tools and equipment used to install culverts, and describe their procedures for use
- describe procedures to compact bedding for culverts
- identify connecting methods used to connect culverts
- describe procedures to install culverts
|
G-23.03.03L |
demonstrate knowledge of sustainability and environmental stewardship practices |
- identify practices that contribute to environmental protection
|
Range of Variables (include, but not limited to)
- culverts: galvanized steel, plastic, concrete
- tools and equipment: wrenches, levels, shovels, wheelbarrows, skid steers, mini excavators, plate tampers, jumping jacks
- connection methods: bell and spigot, clamped and butted